How much gravel do I need?

The short answer: multiply your area by depth to get volume, then multiply by density to get weight. This guide shows the full working, the depths typical projects use, and the honest caveats — or skip to a tool: the gravel calculator does all of this instantly.

The formula

Volume = Length × Width × Depth
Weight = Volume × Density

Depth is where most estimates go wrong: it has to be in the same units as the rest. Since gravel depth is usually given in inches, divide by 12 first — 3 inches of gravel is 0.25 feet. Then:

  • Cubic feet → cubic yards: divide by 27
  • Cubic yards → tons: multiply by the material's density (about 1.4–1.5 for most gravel, up to ~1.6 for crusher run)

Worked example: a 20 × 10 ft space at 3 inches deep: 20 × 10 × 0.25 = 50 ft³ → 50 ÷ 27 = 1.85 yd³ → 1.85 × 1.42 ≈ 2.6 tons of gravel.

How deep? It depends on the job

Typical gravel depths by project
Project Typical depth Why
Walkway / path2–3"Deep enough to look full over fabric, shallow enough to walk on
Landscape bed2"Weed suppression without smothering plant roots
Play area3–4"Cushioning; pea gravel is the usual choice
Driveway base + top4–6" + 2–3"Two layers: structural base, clean finish
Paver base (patio)4–6"Compacted angular stone carries the load
French drain trenchtrench-sizedVolume is the trench, not the ground above it
Aquarium substrate1–3"Tank math in pounds — a different tool entirely

Common sizes, pre-computed

Gravel (≈1.42 t/yd³) needed for common areas
Area 2" deep 3" deep 4" deep
100 ft² (10 × 10)0.62 yd³ · 0.9 t0.93 yd³ · 1.3 t1.23 yd³ · 1.8 t
200 ft² (20 × 10)1.23 yd³ · 1.8 t1.85 yd³ · 2.6 t2.47 yd³ · 3.5 t
400 ft² (20 × 20)2.47 yd³ · 3.5 t3.70 yd³ · 5.3 t4.94 yd³ · 7.0 t
800 ft² (40 × 20)4.94 yd³ · 7.0 t7.41 yd³ · 10.5 t9.88 yd³ · 14.0 t
1,000 ft² (50 × 20)6.17 yd³ · 8.8 t9.26 yd³ · 13.1 t12.35 yd³ · 17.5 t

When to order extra

Calculators — ours included — return the loose quantity for the exact shape you entered. The real world adds:

  • Compaction: crushed bases lose 10–15% of their loose depth under a plate compactor.
  • Uneven ground: dips quietly eat more gravel than the plan says.
  • Spillage and edging: some material always ends up outside the lines.
  • Load rounding: suppliers deliver in practical increments.

Ordering 5–10% over the estimate is the norm for surface gravel; for compacted bases make it 10–15%. For the deeper story on accuracy, read are online gravel calculators accurate?

Tools that do the math for you

Last updated: September 20, 2026